28-Mar-2024
The basement remodeling project is done. Studs are in place. Drywall is up and painted. Wiring is in place. Painting is done and ceiling tiles are installed. Trim and the painting of the floor is done.

Click the thumbnails below to see the progress.

 

Created and hosted by Grey-Wolf Enterprises © 2024
The Wolfley Aberration is an ever evolving website as new items will be added and subtracted when time permits.

Website powered by TeraScript.